Last week we looked at the
lighting systems being used in the workshop. This week it’s time for power.
Power Points
It’s one of those things that sounds pretty simple
– where in a workshop to put the power points. However, if you want the best
outcome, it’s anything but simple.
For example, many people distribute the power
points evenly around the periphery, eg in a shed putting one double power point
in each bay. But that assumes that the requirement for power is also spread
evenly throughout the workshop.
And that’s not normally the case.
In fact, before you can know where to position the
power points, you need to have a good idea of how the workshop will be
organised.
We will cover the reasons for the internal
organisation in next week’s article, but at this stage just take a look at where
things will go. (Note: these diagrams are only roughly to scale!)
As can be seen, across the back wall of the shed
(ie, the far wall as you enter through the roller doors on the right) there are:
lathe, mill, bandsaw, and a bench housing a sander, grinder, drill press and
hydraulic press. Furthermore (and not shown on the diagram), tucked below the
bench is an air compressor.
Therefore, just across the shortest wall, there
are seven machines requiring power. Clearly, lots of power outlets are needed
here!
But you can go one step further. Both the mill and
the lathe may well need a second power outlet for each machine. For example,
each might need a suds pump to circulate coolant over the item being machined.
Each might also need a dedicated work light. So it makes sense to provide both
the lathe and the mill with double power outlets.
The bandsaw, grinder, sander, drill press and
compressor are most likely to need one power outlet each – so that’s
two-and-half doubles. So, leaving one spare outlet, that adds another three
doubles.
Put these power outlets on the diagram (each green
dot a switched double power point) and the distribution looks like this.
But hell, go on at this rate and the workshop will
have something like 25 power points! That’s far more than is needed, so let’s
apply the same logic we did to the first section of the workshop – what
power-using activities will be taking place?
Certainly, the island workbench will be a hive of
power use. An angle grinder, jig-saw, portable electric drill and other electric
hand tools will be often used. Rather interestingly, each of these tools can
also easily cut or penetrate power cables, so here another aspect needs to be
considered – safety. By far the safest way of getting power to a bench is by
means of a hanging power socket. By plugging into a socket located above your
head, cords no longer need to run across the floor and the workbench itself.
So we can add a hanging power socket located above
one end of the workbench. We can also put in another hanging power socket, along
the same plane but located closer to the centre of the workshop. Remember, these
are above head height so don’t intrude at all.
About this stage I physically stood in the near
empty workshop, muttering to myself and pretending to do jobs.
“OK, I need to make a bracket. I’ll cut it out
with the bandsaw, smooth the edges with the belt sander, drill some holes in it
with the drill-press.
“OK, time to turn up the radio.”
Er, but where’s the power outlet for the radio?
There isn’t one! Something as simple as that – a radio needs its own power
outlet within easy reach of the workbench. Ditto for a cooling fan. Here the
extra power outlet has been added.
Time for more talking to myself.
“Ok, now I’ll install the bracket under the
bonnet. Bring the car in and park it at a slight angle to enhance access.
“Now where’s that power point for the electric
drill?”
Here another three double power outlets have been
added. The one nearest the roller doors will be mounted adjacent to the
switchboard, near the light switches and another special power outlet I’ll come
to in a minute. As can be seen, the north-east part of the shed is being
designated as the ‘car working’ area.
(So what’s that darker blue car that never moves?
It’s very likely to be an old car being restored, or a new unique car being
built. I know from experience that will be something or other that just takes up
space for years – and rather than pretend it won’t happen, I am organising the
workshop around it!)
So what about power outlets on the southern wall?
I think only one double will be needed. The grey object, the pan brake metal
folder, weighs a huge amount so once it’s in place, it’s very unlikely to be
ever moved.
Totals
Let’s add them up. The wall-mounted power points
comprise 10 doubles – a good number, as power points can be bought in bulk in
packets of ten. In addition, there are two hanging single power outlets at the
‘working’ end of the workshop.
In case I need power outside the workshop, there’s
a power outlet close to the doors, and there’s a ‘surplus’ power point near the
workbench for a radio or fan. The permanently installed power tools each have
power access, and power tools that will be rolled into position for relatively
rare use (eg power hacksaw, friction cut-off saw, wood-cutting saw bench) can
use the hanging power outlets or those on the north wall.
Handheld power tools being used on cars can also
use the north wall power outlets (three doubles in this area), the single
southern wall double or the single hanging nearest to the workshop centre.
The
Special Power Point
And
there’s another, special, power outlet I want installed next to the switchboard.
It’s a high current power outlet. Most power outlets in Australia are rated at
10 amps but you can also buy power outlets capable of much higher currents. How
high then? Well, without going to a three-phase power system, you can have a 32
amp power outlet, a design that has a uniquely configured socket and plug.
And
why have a 32 amp power point? It makes it so much easier to charge an electric
car....
|
Electrician Quotes
I started buying the power outlets many months
before the shed was built.
Using eBay, a packet of ten double power outlets
was bought for AUD$55 and ten deep mounting blocks for $19. These prices are way
under half what my local hardware store charges - and the goods were brand new.
To form the mounting plates for the power points,
galvanised sheets were cut and folded so they would clip around the top-hat
shape girts (longitudinal wall beams). These plates were then pop riveted into
position.
The hanging power outlets (three were bought
although only two were used) cost about $30, complete with hanging chains. These
were a second-hand eBay buy.
As covered last week in Part 6. I also
bought on eBay the surface mount sockets for the metal halide lights.
But it wasn’t until I started to get quotes for
the electrical work that I realised that I’d be buying nearly everything in the
way of hardware!
In short, the quotes for the electrical work were
amazingly high. This is what needed to be done:
-
Wire the 12 metal halide lights to two switches,
in two banks of six
-
Wire the three compact fluorescent lights to one
switch
-
Wire an outside light to one switch
-
Wire 12 power points, probably in two circuits
-
Install a switchboard containing two RCDs (safety
switches), two 10-amp circuit breakers, two 20-amp circuit breakers, one 32-amp
circuit breaker, one main switch
-
Install a 32 amp power outlet
-
Run a cable from the house
-
Install a 50 amp circuit breaker on the house
board
Remember, all the power points and lights were
already supplied and mounted, and the trench would be pre-dug.
The first quote was $2200, but that included the
supply of the 32 amp power outlet ($300!) and a plug to suit it ($140!). The
switchboard, cable, conduit, main switches and some of the circuit breakers were
also to be supplied by this electrician.
After I lifted myself off the floor, I consulted
eBay to find a 3-pin 32 amp power outlet (good brand, secondhand but in near new
condition) for $58 including postage. I don’t have an immediate need for a plug
to suit this socket, so that knocked $382 off the $2200 quote.
I then went chasing circuit breakers, to find that
they’re available brand new on eBay for $3 each – no mis-print! I
didn’t have these individually priced from the electrician but I can’t imagine
that they’d be anything like this price if supplied. Four-pole RCDs (safety
switches) were only $25 each!
So when the next electrician came to quote, I said
I’d be supplying everything but the switchboard, conduit and cable. His quote
was $1650.
The next electrician, despite having nearly
everything supplied, said that it would take two blokes two full days – and so
the bill would be $2200. After I was resuscitated, I asked if I could run the
wiring in the workshop and they could just do the connections. That was OK but
the bill would still be $1500.
This didn’t make a lot of sense. One electrician
had said it would take 12 hours using one bloke, another said it would take 16
hours with two blokes – WTF? One guy was quoting $2200 supplying nearly
everything, and another was quoting $2200 but supplying only the cable, bare
switchboard and conduit.
I am not begrudging someone earning a decent rate
of pay for the job they do. So to get a feel for the job, I totted-up how long I
thought it would take me to do it, if I knew my way around switchboards and –
more importantly – if I was legally allowed to do it.
-
12 power points at 15 minutes each – 3 hours
(power points already mounted)
-
12 lights at 15 minutes each – 3 hours (lights
already mounted)
-
3 lights at 15 minutes each - .75 hours (lights
already mounted)
-
Running cable for above – 2 hours
-
Switchboards – 1.5 hours (switchboard already
mounted)
[Note: this was the only guesstimate I got quite wrong – in actuality,
it took the electrician more like 3-4 hours to do the two switchboards]
-
Outside light - 0.5 hours (light already
mounted)
-
Running cable to house switchboard – 1 hour
(trench already dug)
Total: 11.75 person-hours
Clearly – clearly – the quote that
said it would take two men two full days (ie 32 person-hours!) was just crazy,
and the quote that budgeted 12 person-hours was about right.
So I went back to the ‘12 hour’ man and asked for
a revised quote if I supplied everything but the cable and the conduit. His
quote dropped to $1100. (Later, when I added the installation of a
[supplied]
safety switch for the house switchboard and added-in the two hanging workshop
power points I’d forgotten to initially mention, the price went up to $1300 –
so, excluding the extra safety switch that’s not part of the workshop build, say
$1200.)
As with the price of the shed itself (see Building a Home Workshop, Part 1), it sure pays to shop
around and to do absolutely as much as possible yourself!
So what electrical parts did I need to buy and how
much were they? After discussion with the electrician, here was my additional
shopping list (remember, cable and conduit were being supplied by the
electrician).
-
2 x 20-amp circuit breakers (for two power point
circuits)
-
2 x 10-amp circuit breakers (for two lighting
circuits)
-
1 x 32 amp circuit breaker (for the 32 amp single
power outlet)
-
2 x 4-pole RCDs (protection for whole shed)
-
2 x 100-amp main switches (one for house circuit
board, one for shed)
-
1 x 18-pole power board (to mount the above
components on)
-
1 x small junction box (to connect the hanging
power points to the rest)
-
1 x 50 amp circuit breaker (for the house
switchboard, to cover the shed)
These components were all bought from the one eBay
supplier – the same firm that had already supplied the power points, metal
halide light surface mount sockets, and the power point mounting blocks. The
bill for the above listed components was just $140, including postage.
Electrical Work
I watched every step of the way Steve the
electrician worked – not because I wanted to check up on him, but because I
wanted to learn. And to be honest, nearly all the wiring was very simple - and
that which wasn’t simple, could be understood after a few minutes of
explanation.
I’d suggest that anyone who can find their way
around the engine management wiring of a car could, after a day of instruction,
safely wire a shed – and after a week of instruction, be able to do it just
about with their eyes shut.
However, here in Australia – and especially in the
state of Queensland – it’s illegal to do any mains power electrical work without
the appropriate licenses.
So I got to sit around and watch Steve wield his
screwdriver. That’s not quite true, because I had to dig the trench (probably
the hardest work in building the whole workshop!) and run a cable.
Conclusion
As you’d expect, having proper power points in the
workshop, and being able to switch on the two lighting systems, made an
immediate and radical difference to the ‘completeness’ of the space. It also
meant that full-on attention could be given to organising storage – and getting
the machinery into the workshop.
Next: organisation and storage
Go here for the next in this series.